







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tremron Home Additions & ADU: The Sunnyvale Owner’s Guide
A failing Tremron system in a Sunnyvale home addition or ADU usually shows itself as one small thing that won’t settle: a paver edge lifting near the threshold, a grout line that keeps reopening, or a door that stopped closing the way it did last spring. Replacement and installation pricing for additions and ADUs in Sunnyvale runs $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a detached ADU, depending on footprint, foundation type and finish level. We don’t carry parts and we don’t stock Tremron products; what we do is match the exact series, pull the permits when the work requires them, and install to a written price before anything starts. A live person answers (888) 426-8719 at any hour.
Most Sunnyvale owners find out something is wrong the same way: the patio slab under a new addition heaves for the first time in September, or the threshold between an ADU and the main house starts holding water after the first real storm. Nobody calls a contractor because a paver looks different. They call because a door drags.
- Direct installed price range for this page: $45,000 – $130,000 for home additions; $90,000 – $220,000 for ADU construction.
- We are an independent remodeling company, not affiliated with Tremron. We install Tremron products alongside KraftMaid, Cambria and Silestone where the project calls for them.
- 365-Day Done Right Promise: if the work fails inside the guarantee window, we come back and fix it at no charge. Free return visit if a repair fails.
Which Tremron Models This Applies To

Tremron makes hardscape and paver lines – Olde Towne, Aberdeen, Pavez and several others under the Tremron family – and the series matters more than most homeowners expect. Olde Towne pavers are cast to a nominal thickness with a hand-scalloped edge; Aberdeen runs to a tighter, cleaner face. When we’re matching an existing run for an ADU pad or an addition patio, we measure three pavers from the field, average them, and check that against the named series. A 2-3mm variance per unit stacks up fast across a 400-square-foot pour, and that’s where the failures start.
The label on the original packaging (usually stapled under a layer in the garage) or a call to the supplier gets you the series. Aftermarket equivalents exist and we’ll price them honestly: they’re less expensive and can be a reasonable choice on a non-visible base course. On visible surfaces, we recommend the OEM Tremron unit because the color and face texture hold the match for years, which matters if you’re adding onto a patio you plan to live beside for a decade.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Tremron Home Additions & ADU Is Failing
- Paver edges lifting near a threshold or door. Underlying cause: base compaction failed or the edge restraint wasn’t pinned. In Sunnyvale’s clay-loam soils, a shallow base course will heave within two wet winters.
- Persistent grout cracks reopening in the same line. Usually movement, not grout chemistry. The substrate is deflecting and the surface is telling you so.
- Water pooling against an ADU foundation wall. Grading or slope is off, and Tremron units placed without a proper drainage course will channel water straight at the wall.
- Color or texture mismatch on a repaired section. This is the classic “we ordered the same color and it doesn’t match” problem. Batches vary; the fix is verification before install, not after.
- Adhesion failure at a bond line. If a Tremron unit has separated from its bedding, the cause is almost always moisture in the substrate, not the product itself.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a Sunnyvale home addition, installed pricing lands between $45,000 and $130,000. ADU construction runs $90,000 – $220,000. The range is driven by three things: how much foundation work the site needs, whether drainage and grading have to be redone to Sunnyvale’s wet-winter standard, and finish selection. A 700-square-foot ADU on flat ground with existing drainage is at the bottom; a two-story addition with soil corrections and a full drainage rebuild pushes toward the top.
Every price we give is written before a single paver is set or a single form board placed. Parts are quoted as a line item, labor as a separate line item, and neither changes once the work starts. We pull the permits that apply, and we schedule the inspections so you’re not stuck chasing a sign-off after the crew leaves. The work carries our 365-Day Done Right Promise in writing, and it stays in force after the final walkthrough.
If you’re also refreshing interiors in the same project, we install KraftMaid, Cambria and Silestone as part of whole-home scopes. Those get their own line items, their own warranty, and their own written price.
DIY or Call Us?
What you can safely check yourself: whether the door drags, whether water pools, and whether the paver face is intact. Photograph the area. Note the season the problem appeared. That detail tells us whether it’s a grading issue or a substrate problem before we ever arrive.
What we don’t recommend: lifting a settled paver run to “see what’s underneath” on an ADU foundation edge, or re-bedding a threshold without checking the drainage falls. The two most common reasons a repair fails are that the base was never recompacted and that the edge restraint was left loose. Both are invisible until they fail, and by then you’ve paid twice.
Give us a call at (888) 426-8719. A live person answers, day or night, and we’ll help you figure out whether this is a $400 repair or a bigger project before you spend a dollar.
FAQs

With proper base compaction and edge restraint, 25 to 30 years is realistic in Sunnyvale’s climate. Without it, five to seven years before heaving is common. The product is the same either way; the base is what determines lifespan. Call (888) 426-8719 for a site assessment.
Often, yes. Localized settling can be lifted and re-bedded without replacing the pavers if the base is sound underneath. If the base is soft or the edge restraint has failed, a repair that doesn’t address the base will reopen within a season. We tell you which one you have before we quote.
A localized repair typically takes one day. A full addition scope runs four to eight weeks depending on permits and inspections; an ADU runs ten to sixteen weeks. We give you a written schedule with the price so you know both before we start.
We match the series from the label or by measurement, then price the OEM unit and any quality aftermarket equivalent side by side. You choose. We never carry stock and never claim otherwise. Call (888) 426-8719 and we’ll walk you through what your series is.
Written by the team at Penhallow Remodeling Sunnyvale, serving Sunnyvale and nearby areas.












