







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Schluter Home Additions & ADU: The Sunnyvale Owner’s Guide
If you’re planning a home addition or ADU in Sunnyvale and want the waterproofing and tile work done right from the slab up, Schluter systems are what we install. Installed additions typically run $45,000 – $130,000 depending on footprint and finish level, and ADU construction runs $90,000 – $220,000; garage conversions land at $30,000 – $80,000. This is planned construction, not emergency work, so we schedule it properly: a written price before we start, a real arrival window, and a background-checked, uniformed crew on every visit. Penhallow Remodeling Sunnyvale is an independent service provider and is not affiliated with Schluter.
Most owners discover a Schluter problem months after the tile looks finished. A shower bench in an ADU bathroom starts weeping at the seam. Grout along a new addition’s wet wall turns dark and won’t come clean. Thin-set pops loose over what should have been a bonded membrane. By the time water shows on the ceiling below, the failure has usually been moving quietly for a season or two. That lag is why we inspect the waterproofing assembly – not just the tile – before we quote any repair.
Which Schluter Models This Applies To

Schluter isn’t a single product. It’s a family of systems, and matching the right one to your project matters more than most homeowners realize. The common ones in Sunnyvale additions and ADUs:
- KERDI and KERDI-BOARD – the bonded waterproofing membrane and the tile backer board. KERDI comes in rolls (typically 3’3″ and 5′ widths) and KERDI-BOARD in panels from 1/2″ to 2″ thick. The panel thickness changes the finished wall dimension, so the wrong board throws off a shower niche or a bench.
- DITRA and DITRA-HEAT – the uncoupling membrane under floor tile, and its heated cousin. DITRA-HEAT requires a specific thermostat and a dedicated circuit; retrofitting heat into a finished addition floor is a different job than installing it during the build.
- SCHIENE, JOLLY, and RONDEC – the edge profiles. These are the aluminum or PVC trim pieces at tile edges and corners. They’re sized to tile thickness, so a profile spec’d for 3/8″ tile won’t seat on a 1/2″ porcelain.
- KERDI-LINE and KERDI-DRAIN – linear and point drains for curbless showers. The drain assembly and the membrane have to be the same system, or the bond fails at the flange.
Identify what you have by reading the printed edge of the membrane or the panel face – Schluter stamps the product name on it – and measure tile thickness with a caliper before buying any profile. OEM Schluter parts and genuine KERDI are worth the premium here; knockoff membranes sold online often fail the bond test, and a $40 savings on membrane is a $4,000 tear-out later. We don’t stock parts or carry them on a truck – we source the correct system for your specific build.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Schluter Home Additions & ADU Is Failing
Waterproofing failures don’t announce themselves. Here’s what we actually see when we open up a Sunnyvale addition or ADU bathroom:
- Grout that darkens and stays dark. Moisture is wicking behind the tile because the membrane bond broke or the thinset was mixed wrong. If it won’t dry out after a week of no showers, the assembly is holding water.
- Loose or hollow-sounding tile. Tap a tile with a screwdriver handle. A dull thud instead of a sharp click means the thinset didn’t bond – often from a dusty substrate or a missed primer coat.
- Efflorescence (white powdery staining) at grout lines and bench seams. That’s salt pushed out by constant moisture behind the tile. It’s the first visible sign of a failed membrane, not a cleaning problem.
- Soft or spongy floor near a drain or shower entry. The uncoupling layer failed and water reached the subfloor. In a Sunnyvale ADU built on a slab, this often shows as a cold, damp patch that never dries.
- Musty smell that returns after cleaning. That’s mold in the wall cavity or under the floor. By the time you smell it, the moisture has usually been present for months.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Waterproofing repairs and re-tile in a Sunnyvale addition or ADU run on a range, and the range is real – here’s what drives it.
| Scope | Installed Range |
|---|---|
| Spot membrane repair + re-tile (small area) | $800 – $2,500 |
| Shower rebuild with new KERDI assembly | $4,500 – $12,000 |
| Full bathroom waterproofing + tile in an ADU | $9,000 – $28,000 |
| Addition or ADU build (per page lead range) | $45,000 – $130,000 |
What moves the number: how much tile has to come out to reach the failure, whether the substrate itself is compromised, and whether the original build used genuine Schluter or a substitute. A $2,000 repair turns into a $10,000 rebuild when the whole pan has to come up. We give you a written, line-item price before any demo – parts and labor broken out – so you can see exactly what the membrane, the thinset, and the tile each cost. Every repair carries our 365-Day Done Right Promise: if it fails inside the year, we come back and make it right at no charge, including the free return visit. No change orders mid-job.
DIY or Call Us?
Some checks are safe for a homeowner. You can tap tiles for hollow spots, look for efflorescence, sniff for musty odor, and run a shower for ten minutes to see if water appears below. Reading the product name off a membrane edge is fine too. What you shouldn’t do is cut into a waterproofing assembly, try to re-bond a KERDI seam yourself, or pull up a drain flange to “see what’s under there.” A bad seam repair spreads the leak, and pulling a drain can break the bond to the subfloor – turning a small fix into a full pan rebuild.
Schluter systems are unforgiving of shortcut installation; the membrane has to be bonded with the right thinset over the right substrate, and one missed overlap voids the assembly. That’s the kind of work we handle. Call (888) 426-8719 for a free estimate – a live person answers 24/7, and we’ll tell you honestly whether you’re looking at a spot fix or a rebuild.
FAQs

A properly installed KERDI assembly should last the life of the tile – 20-plus years in normal use. Failures almost always trace to installation error, not the product: wrong thinset, a missed seam overlap, or tile set over a contaminated substrate. In Sunnyvale’s mild climate the assembly isn’t fighting freeze-thaw, so when it fails, it’s the build, not the weather. Call (888) 426-8719 for an exact quote – estimates are free.
Sometimes, yes – a localized seam failure or a single failed tile can often be repaired without a full tear-out, provided the membrane underneath is still sound. We test the surrounding area before deciding. If the failure has spread, a full rebuild is cheaper than repeated patch jobs. Call (888) 426-8719 and we’ll assess it honestly.
A spot membrane repair and re-tile is usually a 1 – 3 day job once we’re on site; a full shower pan rebuild runs 5 – 10 days because of cure and waterproofing test time. An addition or ADU involving Schluter throughout is measured in weeks, scheduled around your written timeline. Call (888) 426-8719 for a real arrival window.
We source genuine Schluter systems matched to your specific build – the correct KERDI board thickness, the right DITRA membrane, and profiles sized to your actual tile. We don’t stock parts or carry them on a truck; we order what your project needs and confirm it before demo. Call (888) 426-8719 for a written price that includes the material.
If you’re in Sunnyvale and your addition or ADU waterproofing has started to show its age, the smart move is a free, no-pressure estimate before the damage spreads. We’ll tell you what’s actually failing, give you a written number, and back it with our 365-Day Done Right Promise. Call (888) 426-8719 today – a real person picks up around the clock. We’re also glad to coordinate matching cabinetry and countertops from KraftMaid, Cambria, or Silestone if your project includes a kitchen or bath finish.
Written by the team at Penhallow Remodeling Sunnyvale, serving Sunnyvale and nearby areas.












